Snohomish County Planning Display August 18, 2021

Details
$500
Placed on 8/18/2021
|
Views: 79
LEGAL NOTICE


Publication Date: August 18, 2021


Call the planner assigned to the project.

Review project file at Snohomish County Planning and Development Services (PDS)
2nd Floor Customer Service Center.
• *NEW * Permit Center and Record Center Hours are

o
8:00 a.m. to Noon & 1:00 p.m. to 4:00 p.m. Mon, Tues, Wed and Fri
o
10:00 a.m. to Noon & 1:00 p.m. to 4:00 p.m. Thurs
o
Please call ahead to be certain the project file is available.
o
Please Note: submittals of projects are now taken by appointment only
To comment on a project:


Submit written comments to PDS at the address below. All comments received prior to
issuance of a department decision or recommendation will be reviewed. To ensure that
comments are addressed in the decision or recommendation, they should be received by PDS
before the end of the published comment period.

Comments, on a project scheduled for a hearing before the hearing examiner, may be made by
submitting them to PDS prior to the open record hearing.

PDS only publishes the decisions as required by Snohomish County Code. Persons will receive
notice of all decisions that they have submitted written comment on, regardless of whether or
not they are published.

You may become a party of record for a project by: 1. submitting original written comments and
request to become a party of record to the county prior to the hearing, 2. testifying at the
hearing or 3. entering your name on a sign-up register at the hearing. NOTE: only parties of
record may subsequently appeal the hearing examiner’s decision or provide written or oral
arguments to the county council if such an appeal is filed.
To appeal a decision:


Department decisions (including SEPA threshold determinations): submit a written appeal and
the $500 filing fee to PDS prior to the close of the appeal period. Refer to SCC 30.71.050(5) for
details on what must be included in a written appeal.

A SEPA appeal also requires that an affidavit or declaration be filed with the hearing examiner
within seven days of filing the appeal, pursuant to SCC 30.61.305(1).

Hearing examiner decisions issued after a public hearing are appealable as described in the
examiner’s decision. Notice of those decisions is not published. You must have submitted
written comments to PDS or written or oral comments at the public hearing in order to appeal
a hearing examiner’s decision.

Building and Grading applications associated with a Single Family Residence are not subject
to the County’s appeal process. To file a judicial appeal in Superior Court, refer to
WAC 197-11-680 and RCW 43.21C.075.
How to Reach Us:

The Customer Service Center for the Snohomish County Planning and Development Services is
located on the 2nd floor of the Robert J. Drewel Building at 3000 Rockefeller Avenue, Everett.

Planning and Development Services


County Administration Building

3000 Rockefeller Avenue, M/S 604
Everett, WA 98201
Phone: 425-388-3311 TTY
FAX: 425-388-3872

http://www1.co.snohomish.wa.us/Departments/PDS/default.htm

ADA NOTICE: Snohomish County facilities are accessible. Accommodations for persons with
disabilities will be provided upon advance request. Please make arrangements one week prior to
hearing by calling the Hearing Examiner’s office, 425-388-3538 voice, or contact (PDS) at 425-3887119
voice, or 388-3700 TDD

NOTICE OF APPLICATION
File Name: Murphy/Beavon Retaining Wall
File Numbers: 21-113177 SHOR, 21-113178 SHOR 21-105874 LDA, 20-105879 AB
Project Description: Murphy/Beavon family installed an upland retaining wall at the top of the approximately
65-foot-tall marine bluff to protect the existing single-family residential infrastructure above Possession
Sound. After multiple landslides, a geotechnical assessment concluded that an upland retaining wall was
immediately necessary for the safety of the existing home and to mitigate future landslides in the loose soils
of the upper 12 feet of the bluff. The project includes lowering the backyard approximately three feet and
installing a timber lagging and soldier pile retaining wall with tiebacks at the crest of the bluff. The project is
disconnected from the shoreline and does not affect shoreline processes, especially due to the presence
of an existing bulkhead at the base of the bluff that is connected to adjacent neighboring bulkheads. On
March 6, 2020, Snohomish County issued a memorandum acknowledging emergency status for the project
under WAC 197-11-880, SCC 30.61.020, and SCC 30.61.030.
Location: 514 39TH PL NW, MARYSVILLE
Tax Account #: 004539-000-001-02
Applicant: SHEILA MURPHY
Date of Application/Completeness Date: July 27, 2021
SEPA review: The department has determined that this proposal is not likely to result in any significant
adverse environmental impact, and that issuance of a DNS is likely following the comment period for this
notice. The optional DNS process of WAC 197-11-355 is being used for this proposal and includes the
following:

1) This may be your only opportunity to comment on the environmental impacts of the proposal.
2) The proposal may include mitigation measures under applicable codes, and the project review
process may incorporate or require mitigation measures regardless of whether an EIS is prepared.
3) A copy of the subsequent threshold determination for this proposal may be obtained upon request.

Approvals required: Department of Ecology, Land disturbing activity and building permits as required
Comment Period: Submit written comments on or before September 17, 2021
Project Manager: Emily Swaim, 425.388.3213
Project Manager e-mail: emily.swaim@snoco.org EDH935858

NOTICE OF APPLICATION
File Name: DGR Cascadian Way File Number: 21-114455 SPA/21-114456 LDA
Project Description: To construct 2 new townhomes with 7 units total.
Location: 145 feet south of 161st St SW off Cascadian Way, Bothell
Tax Account Number: 005094-000-019-03, 005094-000-019-06
Applicant: DGR Development
Date of application/Completeness Date: August 13, 2021
Approvals required: Site plan approval using Urban Residential Design Standards (URDS) and all related
construction activity.
Concurrency: This project will be evaluated to determine if there is enough capacity on county roads to
accommodate the project’s traffic impacts, and a concurrency determination will be made. Notice of the
concurrency determination will be provided in the notice of project decision. The notice of decision will be
provided to all parties of record for the project.
Comment Period: Submit written comments on or before September 8, 2021.
Project Manager: Brian Farrell, 425.262.2192
Project Manager e-mail: Brian.Farrell@snoco.org EDH935862

LEGAL NOTICE

See PDF at http://50.47.68.138/classified/legals/pdf/2021/2598553.pdf
Find Similar Listings
&icat=Legal Notices &icls=108 9923 Legals General Legal Notices 108 Legal and Public Notices 423861 Announcements